Veracruz Oil Terminal

Civil works for the construction of the marine terminal for the reception, storage and delivery of gasoline, diesel and turbosine, located in the new Port of Veracruz, which will have a capacity of 2,100,000 barrels and consists of 12 storage tanks with API 650 standard.

OCP participated in this project with the construction of dikes, buildings, perimeter fence, foundations, retaining wall and electrical ducts.