{"id":641,"date":"2024-04-11T12:00:47","date_gmt":"2024-04-11T18:00:47","guid":{"rendered":"https:\/\/grupoocp.com\/en?p=641"},"modified":"2024-04-23T12:58:43","modified_gmt":"2024-04-23T18:58:43","slug":"tunel-sumergido-de-coatzacoalcos","status":"publish","type":"post","link":"https:\/\/grupoocp.com\/en\/tunel-sumergido-de-coatzacoalcos\/","title":{"rendered":"SUBMERGED TUNNEL OF COATZACOALCOS"},"content":{"rendered":"<p>[et_pb_section fb_built=\u00bb1&#8243; _builder_version=\u00bb4.24.0&#8243; _module_preset=\u00bbdefault\u00bb global_colors_info=\u00bb{}\u00bb][et_pb_row _builder_version=\u00bb4.24.0&#8243; _module_preset=\u00bbdefault\u00bb global_colors_info=\u00bb{}\u00bb][et_pb_column type=\u00bb4_4&#8243; _builder_version=\u00bb4.24.0&#8243; _module_preset=\u00bbdefault\u00bb global_colors_info=\u00bb{}\u00bb][et_pb_text admin_label=\u00bbThe project consists of a road tunnel built under the Coatzacoalcos River at its mouth,&#8230;\u00bb _builder_version=\u00bb4.24.0&#8243; _module_preset=\u00bbdefault\u00bb text_orientation=\u00bbjustified\u00bb hover_enabled=\u00bb0&#8243; global_colors_info=\u00bb{}\u00bb sticky_enabled=\u00bb0&#8243;]<\/p>\n<p>The project consists of a road tunnel built under the Coatzacoalcos River at its mouth, so that the margin of the City of Coatzacoalcos\u00a0with the AllendeCongregation is united.\u00a0The tunnel will have a length of 1200m. The scope of OCP in this project includes the Engineering for Control Buildings, developing the Architectural, Structural and Facilities Executive Project.\u00a0<\/p>\n<p>[\/et_pb_text][\/et_pb_column][\/et_pb_row][et_pb_row _builder_version=\u00bb4.24.0&#8243; _module_preset=\u00bbdefault\u00bb global_colors_info=\u00bb{}\u00bb][et_pb_column type=\u00bb4_4&#8243; _builder_version=\u00bb4.24.0&#8243; _module_preset=\u00bbdefault\u00bb global_colors_info=\u00bb{}\u00bb][et_pb_gallery gallery_ids=\u00bb644,645,646,647,648,649&#8243; show_title_and_caption=\u00bboff\u00bb _builder_version=\u00bb4.24.0&#8243; _module_preset=\u00bbdefault\u00bb border_radii_image=\u00bbon|12px|12px|12px|12px\u00bb global_colors_info=\u00bb{}\u00bb][\/et_pb_gallery][\/et_pb_column][\/et_pb_row][\/et_pb_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The project consists of a road tunnel built under the Coatzacoalcos River at its mouth, so that the margin of the City of Coatzacoalcos\u00a0with the AllendeCongregation is united.\u00a0The tunnel will have a length of 1200m. The scope of OCP in this project includes the Engineering for Control Buildings, developing the Architectural, Structural and Facilities Executive [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":643,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"on","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/grupoocp.com\/en\/wp-json\/wp\/v2\/posts\/641"}],"collection":[{"href":"https:\/\/grupoocp.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/grupoocp.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/grupoocp.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/grupoocp.com\/en\/wp-json\/wp\/v2\/comments?post=641"}],"version-history":[{"count":0,"href":"https:\/\/grupoocp.com\/en\/wp-json\/wp\/v2\/posts\/641\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/grupoocp.com\/en\/wp-json\/wp\/v2\/media\/643"}],"wp:attachment":[{"href":"https:\/\/grupoocp.com\/en\/wp-json\/wp\/v2\/media?parent=641"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/grupoocp.com\/en\/wp-json\/wp\/v2\/categories?post=641"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/grupoocp.com\/en\/wp-json\/wp\/v2\/tags?post=641"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}