{"id":706,"date":"2024-04-12T11:31:59","date_gmt":"2024-04-12T17:31:59","guid":{"rendered":"https:\/\/grupoocp.com\/en?p=706"},"modified":"2024-04-23T13:10:50","modified_gmt":"2024-04-23T19:10:50","slug":"proyecto-188-s-e-1116-transformacion-del-noreste-3a-fase","status":"publish","type":"post","link":"https:\/\/grupoocp.com\/en\/proyecto-188-s-e-1116-transformacion-del-noreste-3a-fase\/","title":{"rendered":"188 PROJECT S.E. 11-16 NORTHEAST TRANSFORMATION (3\u00aa PHASE)"},"content":{"rendered":"<p>[et_pb_section fb_built=\u00bb1&#8243; _builder_version=\u00bb4.24.0&#8243; _module_preset=\u00bbdefault\u00bb global_colors_info=\u00bb{}\u00bb][et_pb_row _builder_version=\u00bb4.24.0&#8243; _module_preset=\u00bbdefault\u00bb global_colors_info=\u00bb{}\u00bb][et_pb_column type=\u00bb4_4&#8243; _builder_version=\u00bb4.24.0&#8243; _module_preset=\u00bbdefault\u00bb global_colors_info=\u00bb{}\u00bb][et_pb_text admin_label=\u00bbThe project located in Ejido Palo Blanco, municipality of Reynosa, Tamaulipas&#8230;.\u00bb _builder_version=\u00bb4.24.0&#8243; _module_preset=\u00bbdefault\u00bb text_orientation=\u00bbjustified\u00bb hover_enabled=\u00bb0&#8243; global_colors_info=\u00bb{}\u00bb sticky_enabled=\u00bb0&#8243;]<\/p>\n<p>The project located in Ejido Palo Blanco, municipality of Reynosa, Tamaulipas.<\/p>\n<p>Consists of 6 transmission lines with voltages of 400 and 138 KV and a total length of 85.65 Km, 6 Substations with voltages of 400 and 138 KV, with a total capacity of 500 MVA of transformation and 14 feeders that will be located in the State of Tamaulipas. The performance of OCP includes the Construction of Civil Works, Ducts and Trenches, Roads and Parking of the Guerre\u00f1o Substation.<\/p>\n<p>[\/et_pb_text][\/et_pb_column][\/et_pb_row][et_pb_row _builder_version=\u00bb4.24.0&#8243; _module_preset=\u00bbdefault\u00bb global_colors_info=\u00bb{}\u00bb][et_pb_column type=\u00bb4_4&#8243; _builder_version=\u00bb4.24.0&#8243; _module_preset=\u00bbdefault\u00bb global_colors_info=\u00bb{}\u00bb][et_pb_gallery gallery_ids=\u00bb709,711,712,710,713&#8243; show_title_and_caption=\u00bboff\u00bb _builder_version=\u00bb4.24.0&#8243; _module_preset=\u00bbdefault\u00bb border_radii_image=\u00bbon|12px|12px|12px|12px\u00bb global_colors_info=\u00bb{}\u00bb][\/et_pb_gallery][\/et_pb_column][\/et_pb_row][\/et_pb_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The project located in Ejido Palo Blanco, municipality of Reynosa, Tamaulipas. Consists of 6 transmission lines with voltages of 400 and 138 KV and a total length of 85.65 Km, 6 Substations with voltages of 400 and 138 KV, with a total capacity of 500 MVA of transformation and 14 feeders that will be located [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":708,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"on","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[1],"tags":[],"_links":{"self":[{"href":"https:\/\/grupoocp.com\/en\/wp-json\/wp\/v2\/posts\/706"}],"collection":[{"href":"https:\/\/grupoocp.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/grupoocp.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/grupoocp.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/grupoocp.com\/en\/wp-json\/wp\/v2\/comments?post=706"}],"version-history":[{"count":0,"href":"https:\/\/grupoocp.com\/en\/wp-json\/wp\/v2\/posts\/706\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/grupoocp.com\/en\/wp-json\/wp\/v2\/media\/708"}],"wp:attachment":[{"href":"https:\/\/grupoocp.com\/en\/wp-json\/wp\/v2\/media?parent=706"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/grupoocp.com\/en\/wp-json\/wp\/v2\/categories?post=706"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/grupoocp.com\/en\/wp-json\/wp\/v2\/tags?post=706"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}