por divi | Abr 12, 2024 | proyectos
OCP has completed construction and electromechanical projects for the Tuxpan-Tula gas pipeline. We built the Cañada Rica compression station which is part of the 290-kilometer, 36-inch diameter gas pipeline that starts in Tuxpan, Veracruz and extends through the...
por divi | Abr 12, 2024 | proyectos
Work of extension and improvement of the road that joins the cities of Tapachula and Talisman, with a branch line to Ciudad Hidalgo. Total route of 45.1 km through the modernization of three...
por divi | Abr 12, 2024 | proyectos
The project located in Ejido Palo Blanco, municipality of Reynosa, Tamaulipas. Consists of 6 transmission lines with voltages of 400 and 138 KV and a total length of 85.65 Km, 6 Substations with voltages of 400 and 138 KV, with a total capacity of 500 MVA of...
por divi | Abr 12, 2024 | proyectos
Attending the demands of public and private clients, such as hospitals, office buildings, hotels, institutional and administrative buildings and shopping centers. OCP performs medium and low voltage installations, lighting, air conditioning, ventilation, public...
por divi | Abr 12, 2024 | proyectos
Construction of 2 compressor stations that shapes the transport system Ramones “Phase I” It consists of earthworks, civil work, foundations, pipeline system and trenches, roads and 2 station buildings made of compression of natural gas located respectively in Camargo...
por divi | Abr 11, 2024 | proyectos
Civil works for the pipeline project «Los Ramones II Norte», building Main Line Valve (MLV) located in the section of the pipeline of 441 km and 42 inches in diameter ranging from Ramones Nuevo León to San Luis...