por divi | Abr 11, 2024 | proyectos
Construction of underground networks for chemical processes and electrical conduits at the cogeneration Salamanca, Guanajuato Phase I Combined Cycle Plant «which has a net capacity of 373 MegaWatts and steam flow to be supplied for the own refinery adjacent...
por divi | Abr 11, 2024 | proyectos
The project consists of a road tunnel built under the Coatzacoalcos River at its mouth, so that the margin of the City of Coatzacoalcos with the AllendeCongregation is united. The tunnel will have a length of 1200m. The scope of OCP in this project includes the...
por divi | Abr 11, 2024 | proyectos
OCP has worked on electrical, electromechanical and construction projects for the Texas-Tuxpan southern gas pipeline as part of the measurement and regulation stations at Montegrande and Higueros, and has been part of projects that include Landfall Tamiahua, Landfall...
por divi | Abr 11, 2024 | proyectos
Civil works for the construction of the marine terminal for the reception, storage and delivery of gasoline, diesel and turbosine, located in the new Port of Veracruz, which will have a capacity of 2,100,000 barrels and consists of 12 storage tanks with API 650...
por divi | Abr 11, 2024 | proyectos
Maintenance of wind turbines for the wind farm located in the state of Oaxaca, which consists of 34 wind turbines of 3 MW each, with a total installed capacity of 102 MW and capable of generating approximately 390 GWh per...